2020

Position:Home > 2020

KERUI 7000m drilling rig delivered successfully!

News Time:2020.03.18       Traffic:

 On the morning of March 14th, 14 transport trucks full of rig drove out of Kerui Intelligent Equipment Manufacturing Industrial Park and will arrive at a domestic oil field site in the near future.

 The rig shipped this time can meet the drilling requirements of 7000 meters, and meet API, HSE and other design specifications. The whole machine adopts modular design and compact structure, convenient for transportation and installation.

 Due to the inability of the customer to be present during the epidemic, the project team continuously communicated with the customer about the rig test and rectification status through remote video and telephone conferences. Finally, the rig passed acceptance and was delivered as scheduled.